Wastewater Treatment System Design, Installation, Permitting, & Monitoring
MRP Environmental Services, Inc. – (July 2002).
Creekside designed a 100 gpm wastewater treatment system for Metro Rooter Plumbing (located in the industrial section of NW Portland) in June and July 2002. The system is used to treat grease trap wastewater and oily water with sediments, regulated metals, fuels, and organic solvents. In addition to the engineering design work, Creekside also wrote the operation and maintenance manual and completed and submitted the wastewater discharge permit application and Baseline Monitoring Report to the City of Portland, Bureau of Environmental Services. At this point, MRP is in full compliance with the City & EPA regulations for Centralized Treatment Systems (Permit No. 437-001).